Laserfiche WebLink
141 <br /> April 10,1985 <br /> NAVY MASTER PLAN <br /> captain dim Cameron of thconcepts mated States Navy presented the <br /> 0 8omep ide tin m ntepuget nnl Sound. h £ot he Carrier Be tlegroup <br /> a will berth a o13 ship battlegt naval a Visiting <br /> t constructed <br /> p d bei ting constructed <br /> Everett <br /> f the Everett site. The facilities b, berthing <br /> fa in Everett <br /> include the requited waterfrontdredging, barthlin industrial <br /> recreational utrlites for the bettlegroupadmini plus the d parkin induettial suppled, <br /> e 3ona1 exeFange administration and perking facilities needed <br /> o sari't:e trative t�leg[oupp�s ships and erewr. Additional housing <br /> ehoteside personnel stationed fat lac boprovided Po[ the support o£ <br /> a Everett. <br /> The ease is scheduled to begin operation in December 1988 when the <br /> farsnine snips y of thebattlegroup will arrive in Everett. Final <br /> d completion and of <br /> f he Pull battlegroup 3e o take place two <br /> years later, <br /> P it <br /> On motion,the meting adjourned at 12:35 p.m. Yui�9 <br /> /C3 .td c� I ( II <br /> Klerk <br /> Read and approved ae printed. 4 Air <br /> I er sent <br /> II1� I <br />