Laserfiche WebLink
' July 10,1985 <br /> 1j1 <br /> 3. The regular meeting f he Eva City until was caloll led t trder <br /> e 8:30 a July 1 .1905-.i Chamber[Pof the Everett <br /> SZ a City Ball,mPresiM Stephenson a771'9'87 <br /> w presiding. <br /> Upon l it <br /> was <br /> found that Mayor meets and ll c nctlmen w questions mment ed with the <br /> request of t held et t 3, 198 o comments <br /> the <br /> ounce by Councilman s res at tation a included <br /> cal recodurird. C e P <br /> council <br /> r a. reheat[e as fol lows:en <br /> ' Capt.Cameron 61 to stat a is <br /> said at is un to cx a 9 e <br /> . this E ver EC he A requi e adopt <br /> final covering at Environmental[Policiesh toncrwvl 1 b[ <br /> .�.re involved in drafting the Facilities requirements.Plan. e review <br /> e <br /> Plan1 ed, et well.be sent h oat y f i and <br /> comment. The permit prccceae for the f e could potentially <br /> require eleven different One o h i hi will[e <br /> applied for v August, 1985 ry the Cops of Engineers Ee1 <br /> Permit which wall the construction and dredging and 111 Pb <br /> approximately a la month process. <br /> es. The Corpswinotify all <br /> interested d involved public agencies and 11 hold a Public <br /> hearing to allow public comment prior to approval o£thin mit. <br /> The navy will be required t comply with the Federal Coastal 8o <br /> ne <br /> A they w orand coordinate with the city f <br /> },ng}' surem13 conformance. The city well review <br /> e <br /> end comment theCoastal <br /> t e <br /> r <br /> De rmination eport whichwill be the end dcu <br /> on ent <br /> F�% covering this. The city and state are now involved in the process <br /> } Oe 1 determining the exact procees and permit reque[emens for the site <br /> 2 1 f the dredge e disposal. The councilwillhave direct involvement <br /> _t I.e. with the contract for water and sew utilityneeds for <br /> the base. <br /> Negotiation fore these services is scheduled begin o July 30. <br /> ivy <br /> The n will also benegotiating for electrical service, gee, <br /> service and slid waeGe disposal. <br /> I 7l h Cameron the t n <br /> Councilman Pope thanked Captain C n Eor[ and <br /> anon and the <br /> reassurance that there well bcity lnvolvment a that there will <br /> be opportunity for public commenta and hearings. <br /> gl <br /> I I <br /> Councilman Overstreet a egress/access <br /> into the process for ase. Ca and <br /> Cameron <br /> stated <br /> for the egreanalysis nod d to the base Captain <br /> ed thatthe 6➢OT analysis a report 11 be forwarded <br /> to the Military Trans. Command in Washington D.C. for review. IE <br /> L adequate, they will do an eligibility determination and n make a <br /> � recommendation. The reports a thenforwarded to the eel for <br /> review re Prot and at that time discussions with the city v regard <br /> amounto the <br /> of funding,years of funding and how it can be applied will <br /> .. Vj' beformulated. h <br /> d. Once the funding v determined,then it is given to• <br /> cityto handle the construction. If the funding is not adequate <br /> for what the city negotiations <br /> be needs a city ra a nepb gin as <br /> corridor, <br /> ource then <br /> ave n adrmee navy begin as <br /> { to e a available iEora add itvona In funding requirements. <br /> €�, Councilman hOve et state e e ebcit�zens of Everett, <br /> that <br /> he <br /> t involved I. determinations <br /> [ ow would <br /> about, i.e. resolution, <br /> Linn, <br /> formal req one a Lu how w t.best <br /> Mayor replied there <br /> council clime hl areas[PubWorks, Police, Fire, etc. and <br /> Beau[ the scouncil they rwo ld be involved in the process. <br /> IN <br />