My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986/04/16 Council Minutes
>
Council Minutes
>
1986/04/16 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 11:35:27 AM
Creation date
9/29/2020 7:28:16 AM
Metadata
Fields
Template:
Council Minutes
Date
4/16/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
148 <br />[ April 16,1906 <br /> WHEREAS, on March 11, 1906, residents of the Riverside <br /> Neighborhood held a neighborhood-wide meeting at which residents <br /> voted on proposed projects: <br /> city ciNTI:r1=EB, be it resolved by the City Council of the <br /> I. The following projects as recommended by Riverside residents, <br /> be impleMented or constr...with the approximately 620,000 <br />' I available through the Community DeVelopment Block Grant <br /> Program. <br /> I/. The City is awaiting a final decision from the Department of <br /> Housing and Urban Development regarding our 1906 CDS0 <br /> budget. If it becomes necessary due to federal budget cuts <br /> to reduce the 628,000 which has been allocated to the <br /> Riverside neighborhood, the highest priority Prole.will he <br /> done first or the project will be scaled back in accordance <br /> 4 with the budget. <br /> I D. =9:DIDIVMIlog=ide1 clelanc4D74etl? DD CD" fDD" <br /> kI I I <br /> B. Scholarship Fund - Allocate $500 of CDBG funds to <br /> provide f inancial assistance for needY children to <br /> 5 1 attend summer school. <br /> C. RIP <br /> D=ggtatiOnDlDra-..12=13;1".Rf,%r= <br /> Remembers' <br /> D. Sidewalk Improvements - Maple Street/Leonard Drive - <br /> Allocate 62,000 of CDBG funds to replace broken and . <br /> I raised sidewalk on the north side of Leonard Drive and i <br /> on the west side of Maple. <br /> 1 21st Street/State Ptteet - Allocate 61,000 of CD. <br /> 5 I funds to replace broken and cracked sidewalk on the <br /> east side of State street <br /> I <br /> 2000 Block of Fulton-Allocate$3,000 of CDSG funds to : <br /> replace broken and cracked sidewalk Co the west aide of <br /> Fulton. <br /> 68 Remaining$17,500 will be used to tepair sidewalks . <br /> CC designated by the Riverside Neighborhood and <br /> approved by the Public Works Department. <br /> III. Should costs be less for tbe above projects than was <br /> originally estimated, projects receiving the next highest <br /> priority shall be initiated, If projected costs exceed the <br /> estimates given, the lowest ptiority or eroiec. <br /> shall be dropped. <br /> 1.'14 <br /> IV. The Mayor be instrUcted to have a Plans and Systems Ordinance <br /> prepared and presented to the City Council which will <br /> officially authorize and fund the development of contract <br /> plans, specifications, and detailed cost estimates for the <br /> improvements listed above. <br /> V. Project D is eligible for matching funds from the street <br /> overlay fund. <br /> I. — <br />
The URL can be used to link to this page
Your browser does not support the video tag.