My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986/10/15 Council Minutes
>
Council Minutes
>
1986/10/15 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 11:41:58 AM
Creation date
9/29/2020 7:36:49 AM
Metadata
Fields
Template:
Council Minutes
Date
10/15/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41> <br /> October 15,1986 • <br /> Forest ark Renovation 62,545,113 <br /> majorrecreational facility 1n the City with a variety of <br /> opportunities available to all e n e the general public. This ' <br /> l <br /> project <br /> identify and implement needed facilities and <br /> improvements throughout the perk. The park also serves • <br /> central headquarters for all park maintenance. Improvements to the <br /> maintenance facility are badly needed to more effectively utilize <br /> limited space and to increase personnel productivity. <br /> Silver Lake Park I 61,583,476 <br /> Identify and implement needed improvements both in Silver Lake Park <br /> and ewlyquited public shoreline. Project include <br /> relocation of c Silver L and the parkparking lot and <br /> improvements to the perking area. Also included would be pedestrian <br /> [ail development a improvements to the interior of Thornton <br /> Sullivan(Silver Lake)Park. <br /> Basch Park Soccer and Softball Fields 62,079,622 <br /> three all-weather fields four <br /> qualitConstruct threesoftball fields In aloerleaf. design a s sch Park. <br /> Included are lights for extended hours of u Otheramenities • <br /> include <br /> parking, concessionstand with announcing booth, restroom¢ <br /> and landscaping. <br /> Walter Ball Pak Soccer ielde 50 964 <br /> construct <br /> threeuth, turf soccer fields without lights. Improve <br /> perking and rebuild res rooms. <br /> 06th Island(DNR Bo[Launch) *1 (45 <br /> Acquire Smith Island property from DIM. Site consists of o mile <br /> of riverf[onts property between I-5 bridge and 12th Street overpass. <br /> Concept of project <br /> is to provide a rowing center similar to Rt. . <br /> Aker Rowi eg c Center on Lake Washington. Facilities would <br /> accommodate acing shells as well ae kayaks andtOther • <br /> improvements w include parking, Picnic, trails, ree rooms and ': <br /> expanded boat launch rfacilities. <br /> Park Rehabilitation • $1,000,000 41, <br /> d <br /> Special over <br /> has been provided the last two years for <br /> implementing rneeded repairs andupgrades all existing x{ <br /> u <br /> parka. Special f ingneeds to continue for this effort. Projects <br /> have been identified by perk staff include items such as <br /> restroom repairs, ...ie. pathwayed playground equipment, k. <br /> horticulture r and any others not <br /> possible within the <br /> general park maintenance budget. <br /> • <br /> TOTAL *33,758,669 _ ,�. <br /> • <br /> 4, m ends deleting from the CIP Bond issue proposal*2 million <br /> o <br /> for South Everett pd <br /> ark land acquisition a recommends that council <br /> s <br /> look to other of financing d acquisition uch as <br /> n ¢ said <br /> removed ncilmlc b ¢issue package, that 1t is a project of high <br /> the committee felt that while this w <br /> f <br /> m the bond <br /> priority to the South Everett community. <br /> 5. that the City Council consider moving the projected <br /> bond R elections gn <br /> rdate from February, 1987t April, 1987 to allow • <br /> adequate time to ran an effective bond campaign. <br /> • <br /> • <br /> • <br /> j ...,mss <br />
The URL can be used to link to this page
Your browser does not support the video tag.