Laserfiche WebLink
1 d <br /> 105 II� <br /> March 11,190] <br /> r M <br /> 132 G 1f 11,002.61 4,707.69 6,300.92 2,950.1] 4104�I'�� <br /> 153 E g cy.ed Svcs 24,190.40 12,029.03 12,169.45 1,776.83 <br /> 192 CD lBlkit Grant. <br /> 6,216.04 2,858.20 3,357.84 1,631.10 '';4 <br /> 401 Utilitias94,483.13 41,248.33 53,236.20 23,450.50 <br /> 501 Equpat 24,551.74 10,566.27 13,984.77 16,034.02 <br /> 501 Equip Rental 24,551.74 10,566.92 13,904.]] 6,000.06 II 1' <br /> 503 CWkrsent al Stores Insu[ 00.00 00.00 00.00 469.84 I1y <br /> 504 Central Stores 3,405.92 1,485.92 00.00 33].]0 .:II <br /> CITY TOTALS $ 956,566.40$388,194.24 0 560,302.16$172,900.01 ,IIP I <br /> RESOLUTION-INTERFUND LOAN I'I <br /> To adopt Resolution No.2829 as follows: 31 <br /> I <br /> WHEREAS, the T uncal has authorized the purchase of 1::.�I <br /> property at 3JtM1 antl Rucker,oan0 <br /> WHEREAS, the City Council bas determined that St is in the <br /> best interest of the Citi to have the General Fund obtain a ., <br /> Snterfund loan to pubchas he property antlpay the loan beck over a ,, <br /> six year time period,and <br /> WHEREAS, the terms o4 an anterfund loan must be set Porth in1 f <br /> a Council resolution, +16 I <br /> NOW,THEREFORE,BE IT RESOLVED by the City Council of Everett <br /> that authorization Is given to the City Treasurer to make an II <br /> interfund loan under the following terms and conditions: �:. <br /> Loan from: LID Guaranty Fundi 4 I <br /> Loan to: General Fund �� n <br /> Amount o4 Loan: $175,000.00 III <br /> Period of Loan March 11,1907 thru <br /> March 11,1993 • <br /> Rate o4 Interest BW TI I <br /> �:f1 <br /> Source of Repayment Property Tax <br /> i <br /> RESOLUTION ' I <br /> 1 Iit <br /> To adopt Resolution No.2830 as 9011aws: 1 I <br /> XHEflEAS, the City Council th qh R 1 ti 2749, l{ <br /> authorized the use o4 City funds t tM1 demon 1 4 th structure <br /> located at 2224 Cleveland,and ilt 1 T II <br /> aTITS,th i y cal i tl t t t tl 1 ti work was y:i1 <br /> performed by a lac tl act ply by tb ity hI <br /> WHEREAS,th City C cal fi tl tat a p e was anC xietl l' T <br /> in the amount]P'$30 000 0 es result o4 the d @ lit on work,an0 <br /> WHEREAS, th C ty Council finds that the Pees Poi the 5 <br /> contractor's services we a paid Pxom City Punds,end <br /> t <br />