, <br />. 110 March 11,1987 <br /> BIDS RECEIVED <br /> Clair Oliver,Utilities Superintendent,stated on February 24,1987 <br /> bids were opened for the...era..W. 3 eybass project with ten <br /> bids received. The apparent low bidder was Will Construction of <br /> Everett. Will Construction hast claimed a bid error and desires to <br /> be released from the bid. <br /> 1 1 <br /> IPSO specifications require the low bidder to submit his bid <br /> worksheets to the City on the workday following the bid opening. <br /> I: Only excusable mathematical errors are justification for releasing a <br /> bidder from his bid. The worksheets were submitted to the City on <br /> February 25, 1987. However,the error claimed by the bidder is an <br /> error of omission,net a mathematical error. <br /> The bids received are as follows: <br /> [ Will Construction $1,669,283 <br /> , Trio°Contracting1,787,324 <br /> Humphrey Construction <br /> Pease 5 Sons 1,819,664 <br /> 2,013,704 <br /> Loco Gen Construction 2,027,718 <br /> I' Dyad Construction 2,032,030 <br /> 1 Wassart Construction <br /> Felton Construction 2,081,203 <br /> 2,086,553 <br /> Olympic Western 2,109,271 <br />'; I 1 - Collucio Construction 2,270,807 <br /> I <br /> : 1 City Staff recommends that the contract be awarded to Will <br /> Construction, the apparent low bidder for $1,669,283 and to <br /> 1 i authorize a bid award to Trieo Contracting for$1,787,324 if Will <br /> Construction does not sign a contract within the required ten days. <br /> It is also recommended to authorize the Legal Department to take <br /> . , action to forfeit Will Construction's bid bond if Will Construction <br /> does not sign the contract. <br /> BID AWARD <br /> Moved by Councilman Overstreet, seconded by Councilman Stephenson <br /> that the contract for Reservoir No.3 BypaSS Project be aiarded to <br /> the low bidder, yall Construction of Everett, based upon their <br /> proposal and unit bid of unit prices extended for the estimated <br /> total of$1,669,283 as received at the bid opening held at 2.00 p.m. <br /> . February 24,1987. If Will Construction does not sign the contract <br /> within the required ten days, the bid is to be awarded to the next <br /> lowest bidder, Trico Contracting for $1,787,324 and the Legal <br /> . Department is authorized to take action to forfeit Will <br /> 1 i Construction's bid bond. <br /> MglorendcatgLI:vggdneorcUmen ''tin' Ye' excePt C°"'''men <br /> i <br /> 1 i . <br /> Motion carried. <br /> I' <br /> ,I <br /> i' <br />