My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987/08/05 Council Minutes
>
Council Minutes
>
1987/08/05 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 11:49:32 AM
Creation date
9/29/2020 7:51:21 AM
Metadata
Fields
Template:
Council Minutes
Date
8/5/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
313 <br /> 11 1 <br /> August 5,1987 <br /> The regular meeting of the Everett City Council was called to order <br /> at 8 30 a m Aug 5, 1987 in the Council Chambers of the Everett <br /> city Hell, President Gipson presiding Upon roll call it was found <br /> that Mayor Moore and all councilmen were present <br /> Minutes of the meeting held July 25,1987 were approved as printed <br /> COUNCIL COMMENTS <br /> , <br /> 2=TcnuirPirhrollI:dlel"sec ge t1t7/::Prowgg::ccert"01 <br /> Everett when state offices ler,moved, as this has been successful 1 0 <br /> in other parts of the country. The beyor said the same letter was 11 <br /> sPnt to the feCe-al and county government officials also I,' <br /> 11 <br /> PRESIDENT'S COMMENTS <br /> 51 <br /> 1 II <br /> 'treci'dect "PrOIn Resource leictrYn/I:ryCctcocuthteclOunE4ITZInccitnen TocnI: <br /> their <br /> """c <br /> He said there would be an executive session at the end of the agmnda_ _ _ - <br /> on a real estate matter. - <br /> RESOURCE RECOVERY UPDATE <br /> President Gipson said this is a report from GBB, Snohomish County's <br /> consultant on Resource Recovery. I 5 <br /> Councilman Morrow said he had read EBASCO's report and ISO'Sand nor/ <br /> had read a report from DRAVO which has some very interesting and <br /> Is:?1:::atdc°47t3,:blionHcof"tfle recnvinw=c111u1NOccbe cg: lel <br /> crucial element of the tip fees affected by the available waY <br /> stream, ash control, recycling efficiency and guarantying emission <br /> standards and many other factors plus the financial ability of the <br /> private vendor, and the consequences are immense Sr future <br /> generations He felt the council needed a number of meetings <br /> reviewing these reports,questioning GBB,MSC°and ORAVO and later 111 t, <br /> rorcilohave a system working with the County Council in their final <br /> Hark Walken of Administration said the County Council tis going to <br /> wait until after they have heard Legge°and then schedule a meeting <br /> or meetings with the City Council to discuss.his <br /> Councilman Stephenson said he rmuld be anxious to see where they <br /> sePropriatley addressed the environmental soundness of the project, <br /> the cost effectiveness and minimizing the volume of the material aS <br /> he felt these were three important points <br /> Representatives of GOB,the consultants employed by SnOhemieh CountY <br /> to evaluate the three vendor's proposals, said the objective of the I <br /> evaluation process was to rank the responding contractors on the <br /> basis of their qualifications and ability to design,construct,own, <br /> test and operate a waste-to-energy facility in Snohon-sh County and <br /> then to reCommend the order of contractors with which to proceed <br /> Ath a memorandum of understanding negotiations <br />
The URL can be used to link to this page
Your browser does not support the video tag.