Laserfiche WebLink
1 1 <br /> Ootober 14,1307 403 <br /> 2111:T:o=."4:groMotITIJI:::.24.L7P2o.;""'" <br /> dik-es shall be constructed to be two feet above the <br /> regulatory flood protection elevation. [' <br /> 10. The applicant shall provide a continuous paved <br /> pedestrian/bike.y adjacent to the main channel of the <br /> Snohomish River extending north to 12th Street NE and south <br /> of the southern terminus of the subject property. This trail <br /> system must be designed to PaIrkS Department.e.fiCatiOnS. <br /> 11. The City shall provide temporary erosion control in the form <br /> of bridging across all drainage ditches and by Placement of <br /> silt fences in and around drainage ditches as necessary to <br /> prevent drainage from the project site into adjacent <br /> ditches. Construction water shall be pumped into lagoons or <br /> settlement ponds. The City shall protect surrounding <br /> vegetation from erosion runoff from the construction area <br /> through the installation of silt fences, halides, etc. ' I <br /> between the construction area nd the surrounding vegetated <br /> areas. <br /> [1, I <br /> 12. No motor vehicle use is permitted including two- or <br /> three-wheeled vehicles, on beaches, dunes, or fragile <br /> shoreline areas except for maintenance and preservation of <br /> PUblic health and safety. <br /> "' =or:MIXT:r:orrIrIed 414,11.12LriTerToTI.'g=ro= <br /> 63. <br /> 14. Piers shall be constructed in a manner consistent with the <br /> Snohomish County Shoreline Master Program and not extend into <br /> the river more than 50 feet. <br /> prier ti <br /> FialtitgCtisieeiitgpprirgt if this prijech.16. Water service satisfying all Fire Department requirements <br /> shall be provided. <br /> 17. Prior to construction,complete plans and specifications must <br /> be approved by the Snohomish Health District and prior to <br /> occupancy or use,a permit must be issued. <br /> 18. A Water Quality Certification modification must be obtained <br /> from the Department of Ecology prior to construction. <br /> 19. Upon completion of necessary engineering studies, tide gates <br /> ' 1. <br />