Laserfiche WebLink
September 7,1988 353 <br /> Mayor Moore stated he was not completely satisfied with the <br /> agreement and he felt the County should proviae some assistance in <br /> cleaning the Everett Landfill as it had been used as a County <br /> dumping site. <br /> flex <br /> ltst, :'°Te'felt e .t. t4ttTac,etentotheSierLe <br /> system. <br /> 'sttf.rtZatthhe're'lf!1:1r:VByveranLatieder'lporVentarne"ptumtphieng";::Tnnt <br /> without adding the leachate to the system. <br /> Moved by Councilmember Pops, seconded by Councilmember Langus to <br /> delay authorization of the agreement hetween the City, Snohomish <br /> County and the Silver Lake Water District for a maximum of two weeks <br /> in order to provide satisfactory additional financial information. <br /> Poll was called with all councllmembers voting yes except <br /> Councilmember Gipson who was excused. <br /> Motion carried. <br /> AGREEMENT <br /> The glst Street Bridge will be reconstructed as matt of the Navy <br /> Access Corridor Project. As the City does not have a qualified <br /> structural engineer to review the structural plans and <br /> specifications, staff reCOmmendS that an agreement with Tudor <br /> Engineers of Seattle be entered into for the structural review of <br /> the project. <br /> As the coSt of services is less that $aS,000, advertising and <br /> shortlisting for consultants was not necessary. The selectoon of <br /> the consultant has been approved by the Washington State Department <br /> Of Transportation and all funds are 100%reimbursable from the Navy <br /> Access Corridor Grant. <br /> Moved by Councilmember LANJUS, seconded by Councilmemtwr Pope to <br /> authorize the Mayor to execute an agreement with Tudor Engineers of <br /> Seattle for structural review of the 21st Street Bridge <br /> reconstruction at a cost of$3,900. <br /> Roll <br /> cilmewasmber CaGipson lled wiwhoth was excusall councilmembers voting yes except <br /> Couned. <br /> Motion carried. <br />