Laserfiche WebLink
. - <br /> 385 <br /> September 28,1088 <br /> BIB CALL <br /> rOutlook. Bids to be received 2:00 p.m.Vteorbeetre19,eNt..°` the <br />! JOB ACCEPTED <br /> Lo,4c;;11:;,,Tp.3,11,e the Service Center Roof Replacement at a total <br /> Roll was called with all coonoilmembess voting yes except <br /> Councilmember Narrow who was excused. <br /> Notion carried. <br /> JOB ACCEPTED <br /> 000m0 10 Councilmember Pope, seconded by Councilmember Lenges to <br /> accept as complete the Water Filtration Facility Sludge Handling <br /> System Project by Trice Contracting Inc. at a total cost of <br /> $762,034.75. <br /> Roll was called with all councilmembers voting yes except <br /> Cauncilmember Harrow who was excused. <br /> Motion carried. <br /> LEASE MODIFICATION <br /> radotgrgrgle=t!"eXeeuge:=1:itirergleTrate':74nt <br /> with Chevron USA for property located at the NE corner ofewaols:1 <br /> and Beverly Blvd. <br /> Roll was called with all councilmembers voting Oct except <br /> Councilmember Morrow who was excused. <br /> Motion carried. <br /> RESOLUTION-BUILDING DEAMLITION <br /> 2eog 1:4of:T41:TT167LlesToll::Trded bY "eeei'"e"e "ee te <br /> WHEREAS,the City of Everett Building Official has found that <br /> the building which is located at 7606 Beverly Blvd. is a dangerous <br /> building =triee 'andee tie e""" Code e" the <br /> gt erot%Bi/Oings <br /> WHEREAS, the City Council finds that the Building Official <br /> issued an Order requiring the owners of the property to make the <br /> necessary repairs or to demolish the building;and <br /> demolitrenn ngetakenePla:e2:i!aseg:ireteein tgeOrd="4ne op <br />