My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989/01/04 Council Minutes
>
Council Minutes
>
1989/01/04 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:11:52 PM
Creation date
9/29/2020 8:15:33 AM
Metadata
Fields
Template:
Council Minutes
Date
1/4/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 4,1989 5 <br /> EASEMENT <br /> Moved by Councilmember Overstreet,seconded by Councilmember Gipson <br /> to authorize the Mayor to execute s an easement for a overhead <br /> electrical facility lying west of Reservoirt3, south of Highway <br /> Place and east of Evergreen Wayis Snohomish County P.U.D.No.1. <br /> Roll called with all ncllmembe rs voting Yea sept <br /> Countllmembexa Longus entl Pope vho ver.excused. a .' <br /> Motion carried. )k., <br /> SHORELINE PERMIT RESOLUTION �. <br /> Gerry Ervine Planning Department, stated the Port of Everett <br /> proposes to develop the South Terminal Lag Export facility o <br /> approximateln 35 acres haze logs 111 be scaletl, debrxeked� %ortetl4 <br /> consisting e3 to dolphins is proposed e N eolp hit beexi DO feat marginal o sistinp aP 4 o the ns is . r of the existing marginal <br /> exist. Access to he berth 111 p ill occur <br /> a extension of the <br /> existing timber pile dock.from <br /> the will o n either across the <br /> existing marginal exert or Pxam [M1e vete:at,the proposed dolphin <br /> bench. <br /> There ill also be 5-6 buoys placed south Pc the South Terminal for <br /> g eft storage providing approximately 120,000 quare feet of log <br /> raft n storage. ter e <br /> between South Terminal Pier 1 <br /> will be removed. structures <br /> Upland improvements will include filling thesite with approximately <br /> 100,000bic yards of sand and crusted rock sub-bas wiet% 8-12 <br /> inches of asphalt as a final surface Coe ring. he sting <br /> warehwarehouse may be expended by 45,000 square feet for general existing <br /> Public access improvements <br /> will be be <br /> off-site on.Jett <br /> Bland, the City and the or will b developing uint public <br /> accccess improvement plan for eayside are of the it and the Port <br /> agreed provide. 4110,000 to s pay for past committee <br /> improvements which have not been completed. <br /> Coco etePP re mmenes c nce with the Planning Commission's <br /> r mmentlation pane atlopt a, eaolut len granting the Shoreline Permit. <br /> Pat <br /> tweNoClaien F Port <br /> Administration, said that a Memo of Understanding <br /> nx is in <br /> be before Council forc consideration t1 <br /> eration ln the next e fine n fewtsweeks. This <br /> memo Bill provide Pon r a oversight committee consisting of two Port .. <br /> voing representatives,taiT or thCe % <br /> representatives and Pat McClain a a non <br /> Waterfront Public Access Plaxation of a comprehensive Bayside <br /> an. <br /> CCneffect <br /> n <br /> nbex Morrow expressed c regarding the noise factor <br /> d the on the Rucker Hillneighborhood. He also mentioned <br /> his desire to provide access to the beaches from the downtown area. <br /> o ncilmember Gipson asked about additional muffling of the vehicles <br /> and the monitoring of the noise levels during construction and when <br /> the terminal is in operation <br /> 4i <br /> r." <br />
The URL can be used to link to this page
Your browser does not support the video tag.