Laserfiche WebLink
74 March 1,1989 <br /> 136 Municipal Arta 1,431.56 713 Evergreen 098 Imp, 3,826.69 <br /> 138 Culture-Convent Cent 11,532.36 717 4th Ave West Imp[: 1,025.13 <br /> 141 Cum Res/Self Ina 2,218.57 726 60th St.Sw Impr <br /> 114551 211,478 <br /> CmndReRPnPinosPc" 26430.0 7271 1tahmAvSmpmt9 .0'472.51 <br /> 153 Emergency Med Svcs 22,287.32 <br /> TOTAL CLAIMS $2,128,448.71 <br /> RO11 alletl with ell councfilmembera voting yes except <br /> COuncilmembe[s OSamond entl Overstreet w vete excused. <br /> Motion Carried. <br /> STATE CONTRACT PURCHASE <br /> TheFire <br /> fittings.Department is hose <br /> etaisa replace <br /> available through Wasnch hington a Shose <br /> te <br /> Contract 8171-87 and issuppliedby The Mallory Company 04 Kelso, <br /> Washington. <br /> Moved by CounCllmember Pope, seconded by COuncilmembex Gipson to <br /> authorize the purchase 04 8400 feet of 5 inch fire hose with <br /> fittings from The Mallory Company o4 Kelso, Washington through <br /> Washington State Contract/171-07 at a cost o4$56,141. <br /> Roll <br /> called <br /> Diamond and Overstreet who were excused.rs es except <br /> ouncilmembexs <br /> Motion carried. <br /> BID REPORT <br /> P bid Callwas authorized for remodel of 1989. <br /> Service Center <br /> with bid <br /> opening at 2:00 P.S.on February 16, following bids were <br /> received: <br /> Skillingstad Const,Kirkland $469,700 <br /> Williams h Abbot,Seattle 494,000 <br /> Buchanan General,Bellevue 507,820 <br /> Ferrell-Penning, nc,Seattle 509,800 <br /> L.B.Rowley Const,Seattle 540,000 <br /> T mpo Construction,Bellingham 545,000 <br /> R/H Construction,Lynden 542,595 <br /> Robbins 8 Nelson,Blaine 592,000 <br /> Gwinn Construction Co.,Seattle 764,000 <br /> City staff recommends awarding the bid for the remodel of the <br /> Service t:Center5:1 cto 5k09$4stzd Construction for the bid Of$469,700 <br /> plus state sales tax of$46,636.60 for a total of$506,336.60. <br />