My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989/06/07 Council Minutes
>
Council Minutes
>
1989/06/07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:19:38 PM
Creation date
9/29/2020 8:22:40 AM
Metadata
Fields
Template:
Council Minutes
Date
6/7/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June J,1989 n5 <br /> SUPPLEMENTAL AGREEMENT <br /> Moved by Councilmember Pope,seconded by Councilmember tangos to <br /> authorize the Mayor to execute Supplemental Agreement No. with <br /> Parsons Bxlnckerhorf Puede 8 Douglas Inc. for modifications to the <br /> Navy Access Corridor improvements to Weat Maxine View Drive Pox <br /> access[o tM1e Scott Paper Cxatllt Uion. <br /> Roll Was called with all councilmembers voting yes. <br /> Motion carried. <br /> AGREEMENT <br /> The widening of west Marine View Drive as <br /> a part of the Navy Access <br /> Corridor improvements <br /> requires relocation of the P.U.D. substation <br /> at the foot of Everett Avenue. The City and the PUO haveacome t0 <br /> agreement on the relocation mitigations. <br /> Moved by Councilmember Gip seconded by Councilmember Lengus to <br /> authorize the Mayor to execute e <br /> te an agreement with Public Utility <br /> District N0. 1 of Snohomish County for the relocation of the PUD <br /> substation at the foot of Everett Avenue. <br /> Roll was called with all councilmembera voting yes. <br /> A't <br /> Motion carried. ;$$$; <br /> RESOLUTION-SOLE SOURCE PURCHASE I' <br /> Moved by COuncilmemter Overstreet, seconded by Councilmember Morrow �It <br /> to dept Resolution No.3181 for the sole a purchase of 25,000 ', <br /> cubic yards of sand from milder Construction Das cfollowa: <br /> WHEREAS, the City oP Everett Parke and Recreation Department <br /> La planning Phase II development at Lengus Riverfront Park;a d <br /> WHEREAS, Phase III construction will require approximately �r�frf <br /> 25,000 cubic yards or sand to raise the developed area above the <br /> sites;exist >1'and to pee-load the picnic shelter and perking lot xT..'f. <br /> r, <br /> WHEREAS, W110er Constructl0n ie removing the send they o <br /> from the existing pee-load site at the Neatewe tax nremoeent Plant; <u <br /> and Vii <br /> necessarylm <br /> WHEREAS, ndltlei tynatxuction Ss at Pixm has the <br /> send and safety personnel to immediately transfer to the <br /> Phase Il construction site for ESO to E1.00 per cubic yard. <br /> WHEREAS, the timely purchase oP this eterlal will PP <br /> planning antl c ntractor time during the constxuctinn project, save <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF TUE <br /> CITY OF EVERETT that the Purchasing Department is authorized to <br /> Taos Wilder Constructiourchase 25,000 cubic ns for$26,of 000 end bagging and bulldozer time <br /> Roll was called with all councilmembers voting yes. <br /> Motion carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.