My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989/08/02 Council Minutes
>
Council Minutes
>
1989/08/02 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:19:22 PM
Creation date
9/29/2020 8:24:50 AM
Metadata
Fields
Template:
Council Minutes
Date
8/2/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2,1,89 295 <br /> BID CALL <br /> To authorize the Public Works Department to advertise for bids to <br /> reconstruct 5,000 linear feet of water transmission line Na.2, with <br /> bid opening on August Si,IS.,at 2:00 p.m. <br /> SURPLUS PROPERTY AUCTION <br /> T41sUPugsuction So,lI9forree of111gequig ,,vter September eounpropery. <br /> Roll was called on the consent agenda items with all councilmembers <br /> voting yes. <br /> Motion carried. <br /> BID CALL <br /> Moved by Councilmember Overstreet,seconded by Councilmember Diamond <br /> to authorize a call for bids for four sets of equipment designed to <br /> automatically sample stormflows in natural streams and culverts, <br /> with bid opening at 2.00 p.m.on August 20,1989. <br /> Roll was called with al/councilmembers voting yes. <br /> Motion carried. <br /> AGREEMENT <br /> Den Mathias, Public Works, said the original consulting agreement <br /> between Howard, Needles, Tammen, and Bergendoff ((INTO was for the <br /> design of a sewer force/gravity main for the Navy. Supplemental <br /> Agreement No. I modified the original agreement to incorporate the <br /> design of a combined sewer overflow(C50)control ,41pipeline. I 1 <br /> The design of the Navy sewer force/gravity main and the CSO control <br /> pipeline has been completed. Construction bids are now being <br /> solicited as part of the Navy Defense Access Road project. <br /> Supplemental Agreement Na.2 will allow 00113 to provide construction <br /> management services for both the Navy sewer main and the C50 control <br /> pipeline. <br /> Moved by Councilmember Gipson, seconded by Councilmember Langus to <br /> authorize the Mayor to execute Supplemental Agreement No. 2 with <br /> Howard, Needles, Tamen, and Bergendoff to provide construction <br /> management services for both the Navy sewer main and the CSO control <br /> pipeline. <br /> 5 <br /> Roll was called with all councilmembers voting yes. <br /> Motion carried. <br /> , I <br />
The URL can be used to link to this page
Your browser does not support the video tag.