My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989/11/01 Council Minutes
>
Council Minutes
>
1989/11/01 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:24:13 PM
Creation date
9/29/2020 8:29:30 AM
Metadata
Fields
Template:
Council Minutes
Date
11/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Novemher1,1989 <br /> 443 <br /> BID CALL <br /> To <br /> of:81"8111-31ok'tm, for, 41Zin'An"NtIlberoldn989.se''''te i'sueS <br /> Roll was called on the consent agenda items with all councilmembars <br /> voting. <br /> Notion carried. <br /> AGREEMENT <br /> Bruce Jones,City Attorney, introduced an addendum to the agreement <br /> between the School District and the City establishing a work <br /> schedule for the project, with Ohm project to be complete no later <br /> then March 15,1990. <br /> Moved by Councilmember Pope,seconded by Councilmember Overstreet to <br /> :relTeadtdhendumr:,"vitithr 00 entEVereitt"Sctlgol'Etrirt7incte f:dconglucTon" <br /> and placement of additional grandstand facilities at Everett <br /> Memorial Stadium. <br /> 2) g2L13=mbeNigonmiZvoVej ncr'ncume'ber' voting <br /> "S exce° <br /> 76 <br /> AB <br /> Notion carried. <br /> 71 <br /> 71 <br /> al <br /> JOB ACCEPTED <br /> Moved by Councilmember Pope,seconded by Councilmember Overstreet to <br /> accept as complete the Riverside Signalization Project by Signal <br />.53 <br /> Electric,Inc.of Kent and begin the 30-day retention period for the <br />,3) <br /> release of retainage. <br />.55 <br /> Roll was called with all councilmembers voting yes. <br />.31 <br /> sm <br /> Motion carried. <br />.3) <br />.72 <br /> 1 <br /> JOB ACCEPTED <br />.07 <br /> Novell by CounciIoember Gipson, seconded by Councilmember Overstreet <br /> to accept as complete the 0th Street SW LIO 726 Project by Scoccolo <br /> 1 <br /> Construction, Inc. of Seattle and begin the 30-day retention period <br /> for the release of retainage. <br /> 4/1 Roll was called with all councilmembers voting yes. <br /> Motion carried. <br /> 400 <br /> No <br /> 1.N <br /> 0.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.