,40`',11,' •
<br /> (yy11- Y 2SN July 11,1990
<br /> KJORSVIK SHORT SUBDIVISION W40-89 SEPA APPEAL
<br /> President Pope opened the public hearing by stating the purpose is
<br /> to consider the appeal of an Environmental Determination on the
<br /> Kjorsvik Short Subdivision WA0.89. Appellants are Patricia
<br /> ia
<br /> Johnston,Elmer E.Johnston, Brandon KyDonald an H.
<br /> Hale.
<br /> President Pope stated 11 persons vmuld testifying under oath. He
<br /> asked thet,all persons who wished to speak to stand. The oath was
<br /> h,. administered to all participants by the Clerk.
<br /> He said the staff report would be given first. At that time the
<br /> Appellants would present their testimony. Then the applicant would
<br /> B appellants
<br /> their comments. pl wihe ll be testimony
<br /> time has been for rebuttalven .
<br /> appelellaants end then the
<br /> applicant pplicant
<br /> The hearing x111 then close and council will do their deliberations.
<br /> Don Wood, Planning staff, stated In September of 1999,0 the City
<br /> received a completed application from Walter Kiso locatedr foo Short
<br /> heet
<br /> Subdivision of 8 lots. The subeect propertyand
<br /> rest of Black Forest Lane and 48th Street. The
<br /> 1City
<br /> i yCreviewe Short
<br /> approved an Fe nt Short Subdivision, T y s
<br /> Subdivision,onFebruary 9, 1989. The Carlson Short Subdivision wa
<br /> required to extend the public street to the west property line to
<br /> service the subject property.
<br /> Prior to submittal of Mx. Kjorsvik,s application for review,res
<br /> j� pre-application meeting as held with the City. The app
<br /> recant
<br /> p also requir to submit additional studies. during-the
<br /> Short
<br /> Y� Subdivision and SEPA review. These additional studies were a Slope
<br /> d
<br /> Study Nap, Geotechnical Study and Updated Study,en space ndanbuitvingd sliest
<br /> I After
<br /> Naps showing an buffer environmental vironmental ocheckliist, the above required
<br /> Pte[ and
<br /> co i and citizens, the
<br /> �'�; studies, tl coRe is from it Department, agencies,
<br /> ONS issued a 7,199 Mitigated app Oetexnlnatlon P Non-Significance
<br /> lk. April
<br /> IONS)on April 17,1990. An appeal of the DNS was received on April
<br /> �I 26,1990 from the appellants.
<br /> Mr. Wood
<br /> bdivision
<br /> cess
<br /> Jf 4144
<br /> + approval. The preliminary ewed the uprocess siss too look at which
<br /> conceptual plan
<br /> Iyy d to mitigate any land The final approval process
<br /> included detailed engineering and plat work. This project is In the
<br /> �{4 preliminary portion f the approval process. g r
<br /> I1 1 The issues appealed were erosion, vegetation removal, Unoff,
<br /> I population impact creek, multiple plats, pendituie of public
<br /> 7� funds, Conflicts with local law, environmentallysensitive site,
<br /> stream, slopes, s la, vegetation, buffers and open space,
<br /> .�{ geophysical date lacking, Pilling and grading Data and wildlife
<br /> lacking, steep slope protection lacking, drwells, w
<br /> i
<br /> I rotected,stoves and fireplaces,traffic,end revised checklist.nc
<br /> Mx. Wood reviewed the staff report answering each of the issues of
<br /> appeal. He also summarized the 13 mitigation requirements Of
<br /> cdver5end impacts
<br /> cos,SEPA and the mitigation required by existing
<br /> {
<br />
|