Laserfiche WebLink
256 .July 11,1990 <br /> Chuck Cduvrette a4 Couvredtt theeotechnicphy Engineering, <br /> site 606d133rd <br /> NErecommendations <br /> Woodinville, reviewed o <br /> dations he eviewed regards o slopes and the <br /> and <br /> said <br /> thee intentof <br /> the <br /> thin the tlati opment,to provide a safe location for <br /> Ted Trepanier of Trepanier Engineering, 1620 Hewitt, commented <br /> m nted on <br /> the drainage requirements in the mitigated DNS. He summarized the <br /> stream Plows and the drainage impacts. <br /> Moved by Councilman Morrow seconded by Councilman Gipson to close <br /> the public hearing. <br /> be <br /> FI : acceptable tow assure <br /> public involvementd if innal the finaltiopprovel would tage <br /> of the project.ss Moe Cattle stated this would be acceptable. s <br /> Councilmen Moxoow ekpressetl c n rn with the cumulative efe71 of <br /> the development in LM1e axes anc whether ell issues have been Pully <br /> addressed. <br /> 1 Mr. Hale thastatted that City staff hats erred in Nestincgebthe Nitigthis <br /> k CNS end an EnvlrOnmental Impact Statement is ne saxy on <br /> ,j project, <br /> Mx, eyed reviewetl the process entl gathering 04 Information which <br /> qf�l provided the baste for the Mitigated ONS. c xns <br /> drainage[areegquirAssistantc Works too, reviewedthe <br /> ementsand stated the drainage Id be <br /> d,. addressed tin the Drainage Plan which would be required prior to <br /> final approval. <br /> Bob iantllaoc Planning Staff,provi summarized the formulation and informationdecision <br /> the <br /> making process which o stated <br /> the appropriate <br /> determination. He also limped that additional short ubditieiinformattn. was not <br /> necessary to mitigate the impacts of this short subtlivision. <br /> I President Pope asked if anyone else wished t0 speak end no one <br /> iep lietl. <br /> Roll was called on the motion to close the public hearing with all <br /> Iq councilmen voting yes. <br /> Motion parried. <br /> President Pope reviewed the four options required of Council: <br /> 1. Affirm the Mitigated Determination of Non-Significance, <br /> 2. Remand the project to staff to generate specific additional <br /> information, <br /> 1 3, Recommend preparation o4 an Environmental Impact Statement, <br /> C. Make nddltlonal findings and,basetl on those eroding', revise <br /> the Mitigated Oetaxminetvan o4 Non-Signi4lcance. <br />