My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990/08/15 Council Minutes
>
Council Minutes
>
1990/08/15 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:32:19 PM
Creation date
9/29/2020 8:43:15 AM
Metadata
Fields
Template:
Council Minutes
Date
8/15/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 HOLD HARMLESS AGREEMENT August 15,1990 307 <br /> Patsy Hayes is making the property at 3926 Rucker available to the <br /> Everett Fire Department for the purpose of firefighter drills and <br /> training. The Fire Department and the owner agree that no cost <br /> shall be born by the City and the owner shall bear all costs of <br /> demolition end removal. <br /> Vu=ri'g tC117711 :n to'lc <br /> grnan,M71V.r1 Councilman.=%tIcy' <br /> H.y... <br /> 1 i ' <br /> Roll was called with all councilmen voting yes. <br /> Motion carried. 1 ;'' ''t' <br /> RESOLUTION <br /> Moved by Councilman Morrow seconded by Councilman Moser to adopt <br /> Resolution No. 3353 autliorizing the Public Works Director to ,P,' ,i.h <br /> contract with Wilder Construction to reconstruct the sewer main in ,,,,,,44, <br /> thc 3700 block alley east of Rucker Avenue at a cost of$174,384.29 <br /> as follows; n. <br /> 1/..hlbi <br /> WHEREAS, the Utility Division of the Public Works Department 4;"11'sill <br /> has investigated and identified a structural deficiency in the 88 <br /> sewer line in the 3700 block alley East of Rucker Avenue;and 1!.1`Ill <br /> WHEREAS,the damage needs immediate attention to maintain the <br /> integrity of the sewer line and prevent additional settlement ,!cr n <br /> dec.r.:HgT:%ntZer=a2vision of the Public Works Department <br /> !LI:r t <br /> WHEREAS, funds are budgeted for such repair work by the <br /> Utility; <br /> NOW, THEREFORE, be it resolveis declared td by the City Council of the <br /> City of Everett that an emergency o exist and the 11'41 ,,p <br /> Director of the Public Works Department is hereby authorized to [,': <br /> contract with Valdez Construction to reconstruct the sewer main at a <br /> cost of$174,384.29. IL; 1 41 <br /> Roll was called with all councilmen voting yes. <br /> Motion carried. <br /> Moved by Councilman Gipson seconded by Councilman Moser to eccePt <br /> , <br /> the Fore Station No. 2 tile roof replacement for $22,539.00 as <br /> complete and begin the 30-day retention period. <br /> 41 <br /> l'i'i I <br />
The URL can be used to link to this page
Your browser does not support the video tag.