Laserfiche WebLink
543 <br /> October 9,1991 <br />' ALVERSON BRIDGE SUPPLEMENT NO.2 <br /> Moved by Councilmen Overstreet, seconded by Councilman Gipson to <br /> authorize Supplement No. 2 for the Alverson Bridge (Design <br /> Update and Construction Engineering). <br /> The plans and specification for the Alverson Bridge must be <br /> revised to current 1991 standards. The contract also will be <br />. amended to include as needed" construction engineering <br /> consultation. <br /> o Councilman Diamond vms concerned with the open-endedness of "as <br /> needed." pave Davis,'Public Works, explained that the scope of <br /> work will Cr very limited. Or Davis also explained to <br /> Councilman Gipson that a meeting with the Port will be held <br /> tomorrow. <br /> r Roll was called wit))all councilmen voting yes except Councilmen <br /> Anderson and Pope who were excused. <br /> rMotion carried. <br /> 1.. 0 CHANGE ORDER-NAVY ACCESS CORRIDOR <br /> Moved by Councilman Overstreet, seconded by Councilman Moser to <br /> authorize the Mayor to sign Change Order No. 10 of the Navy <br /> Access Corridor project fol.an increase of$11036.78. <br /> The Construction Inspection Division issued Change Order Na. 10 <br /> a to genera; contractor, Volker Stevin Pacific, Inc. due to <br /> 3 unforeseen conditions during the boring/tunnels operations. <br /> 1 Preesidntgeneral Morrow expressed concern regarding the quality of work <br />. by the contractor. He specifically pointed to work <br /> previously done on 20th Street. <br />) Councilman Moser was concerned that the specifications for the <br /> s underground work were of quality. <br /> ="il--14:2427;=1:VOZ staff <br /> but suggested t'ghten'""P <br /> i ( <br /> , C <br /> i <br />