My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991/11/13 Council Minutes
>
Council Minutes
>
1991/11/13 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:46:33 PM
Creation date
9/29/2020 10:05:17 AM
Metadata
Fields
Template:
Council Minutes
Date
11/13/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
622 <br /> November 13,1991 <br /> This additional fee is due Sr the expanded building program. <br /> Roll was called with all councilmen voting yes. <br /> • Motion carried. <br /> AGREEMENT-BOEING TRANSIT AND DEMAND COORDINATOR <br /> Moved Sr Councilmen Gipson, seconded by Councilmen Moser to <br /> authorize the Mayor to sign e contract with Weslin Consulting <br /> to perform the function of Boeing Transit and Demand <br /> Coordinator. <br /> remand <br /> =fgr:=== g;"= Tgrr:s;X:It.:22 I <br /> received. Four consulting firms were called in for interviews [ <br /> by a panel consisting of representatives of Everett Transit, <br /> Boeing and Community Transit. The Unanimous recommendation was <br /> that Weslin Consulting appeared to be best qualified to perform <br /> She work. The scope of work will focus on Boeing dideshare <br /> Mitigation initially, and is funded from Boeing Mitigation <br /> Funds. Funding is for an approximate 3 year project, at a cost <br /> Cf 6130,000.00. <br /> ' Roll was called with all councilmen Voting yes. <br /> Motion carried. <br /> JOB COMPLETE-PIGEON CREEK NO.1 FISHERIES ENHANCEMENT <br /> Moved by Councilman Pope, seconded by Councilman Moser to <br /> accept the Pigeon Creek Fisheries Enhancement Project as <br /> complete and authorize the Mayor to sign the final contract <br /> voucher certification and start the 30-day retention period for <br /> the release of the retained amount of$4,300.87. <br /> Roll was called with all councilmen voting yes except <br /> CoOncilman Gipson who was out of'council chambers. • <br /> Motion carried. <br /> ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.