Laserfiche WebLink
May 27,1992 <br /> prices extended f°r the estimated total of $2,923,102 as 0 <br /> racaived at the bid opening held at 2:00 p.m.,Nay B,1992. <br /> Roll was called with all councilmen voting yes. <br /> Notion carried. <br /> BID REPORT-DEMOLITION(FIVE HOUSES) <br /> On May 7, 1992, the following bids were opened for the <br /> demolition of floe houses and accessory buildings at 3201, 3205 <br /> and 3209cedarStreet,and 3202 Land a3208 Pine.Street: <br /> J.Harper Contractor,Inc. 534,300.65 . <br /> William Dickson Company 40,425.52 <br /> Taylor's Excavating 49,941.52 <br /> Select Contractor 50,042.30 <br /> Mitchell's Excavating 52,175.05 <br /> Bobby loiford'Trucking 61,450.76 <br /> Rhine,Inc. 61,503.00 <br /> Evergreen Bark k Topsoil 67,293.88 <br /> Staff ram m ends awarding the contract for demolition of five (l <br /> houses andaccessory buildings to the lowest and most lJ <br /> responsive bidder,J.Harper Contractors,Inc. <br /> BID AWARD <br /> Moved by councilman Moser, s onded by Cuuncllman Campbell that <br /> the caetraet fol the demolition of flue houses and a ory <br /> andbuildings located at 3201,3205 and 3209 Cedar Street and a3202 <br /> and 3208 Pine Street be awarded to the 105 bidder, J. Harper <br /> Contractor, Inc., Seattle, based upon the proposal and <br /> estimated total of $34,380.65 as received at one bid opening <br /> held at 2:00 p.m.,Nay 7,1980. e s <br /> Councilean Moser asked if asbestos removal 1 s included in this <br /> bid and Tim Tyler,Building Official,repliedthatit wa <br /> Mayor Kinch explained Lnathoweveratn effort h°intereste0 a the <br /> pronein othate roperty a n't available to place them on. <br /> problemg property w <br /> Roll was ouled with all councilmen Voting yes. <br /> Motion carried. <br />