My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992/12/23 Council Minutes
>
Council Minutes
>
1992/12/23 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:55:42 PM
Creation date
9/29/2020 10:22:06 AM
Metadata
Fields
Template:
Council Minutes
Date
12/23/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
401 <br /> December 23,1992 <br /> WHEREAS, The Herald t is a newspaper of general circulation y (-) <br /> the City of Everett having the qualifications prescribed by <br /> Chapter 65.16 RCM{end <br /> WHEREAS, The Herald made the lowest and mast responsive <br /> proposal to,provide the service of publishing legal notices and <br /> ordinances Pox 1993: <br /> NOW, THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br /> OF EVERETT that The Herald is hereby designated the official <br /> newspaper of the City of Everett until December 31, 1993, or <br /> until a successor official newspaper is designated. <br /> BIO CALL-PRINTING 1993.°OUTLOOK° <br /> To authorize a cell for bids for the printing of the 1993 <br /> •Outlook`. <br />• Roll was <br /> called on the consent agenda items with all councilmen <br /> voting yes. <br /> Motion carried. <br /> 0 <br /> REQUEST FOR PROPOSAL-800MHZ RADIO SYSTEM FEASIBILITY STUDY <br /> Moved by Councilman Diamond, seconded by Councilman Pope to <br /> authorize a request far proposals to conduct an 000MHz radia <br /> system feasibility study. <br /> ncilmembeis•questioned whetter-therewas a: need for <br /> feasibility study, as:it has already been dlscussedand decided <br /> there was a need for the 800 MHz radio system. <br /> Al Upton, Fire, explained that the vendor needs to be decided <br /> and that In talking to people in Oregon who have already had <br /> experience with the'800 Mhz system,.their recommendation was <br /> that .a consultant.is,needed for a feasibilitymstudy. Site <br /> recommedations for.additional antennas and Cost estimates are <br /> necessary and should be done by the independent consultant. <br /> Roll was called with all councilmen voting yes. <br /> Motion Carried. <br /> 421 <br />
The URL can be used to link to this page
Your browser does not support the video tag.