Laserfiche WebLink
• <br /> • <br /> • <br /> •• <br /> • <br /> • <br /> • <br /> February 7,1996 <br /> • <br /> 199dfm Rr n,r66R lammmtsl� <br /> David Bertrand mmn�Co. 55Dierneco 5561.505' <br /> George neC� 9 1 59.363.93 • <br /> BSC Inc. 30,1900 <br /> 72206.68 <br /> SI.Lerma Construction Co.,Ins. 5 74.370.08 • <br /> BOB Commode.,Mc.• <br /> 176,141.93 <br /> Will Construction Co.,Inc. 9 36,5193 <br /> nOMPSOn 9 77209.16• <br />• <br /> 13&6,9.31 <br /> 1 80,99.39 <br /> 1 85,71.00• <br /> COB Campution Service,Ino. 1 93,158.91e <br /> Pacific Contr.Technologies... 5123,635.06e <br /> 'Seven of the Often bids contained numerical erten.The mom*errors were <br /> 33, mrs <br /> The nted amount 3m mer Wad Bamon Commotion pn Co.bid <br />• Staff recommended amending dm comm. 0te lowest ond me.rapOnSiVe <br /> bidder,David Unread Construction Co. <br /> BM AWARD.PPSPRVO11188 PPP,nrPM8x1'sueS <br /> Moved bymem6erpope,ae®eed by Cwm <br /> omember CempbO that <br /> ale 6IF96 <br /> mepmmmt Slabs project be awarded to <br />• Devitt Bartrand Construction Co.,Beverly.WA,based upon mete prepay! <br /> nod unit Mel of omit prim extended for•corrected estimated tot4 of <br /> 59 <br /> i. <br />