Laserfiche WebLink
. ._ <br /> • <br /> lune 26.19E6 <br /> MD EAU•ANIMA,CHM TGE <br />• To authorize call for h,for the Everett Miami Shelter projeetortih <br /> 619 opening scheduled fordo!,B.1”6 at2:00 <br /> ,I0B COMM FTETIEREGSON ROAD ITTROVENIFTTE <br /> To accept the liardeao.Road Improvements project as complete mid begin <br /> the 60-day retention period for the release of 3...along<to the general <br />• <br />• <br /> REIF,RIETta!TR./RITE RErIECIEN...1FACHATE CETI FT, <br /> to reRet all previous hkIs for Mealy of Everett Landfill Leachate Collection <br /> System sad authorize the reelMig•of Me element.of Me proIcet to ture1 <br /> conditions of Me Burlington Northern/Santa Fe railroad <br /> Due to Me merger or/holing.Northern and Santa Fe tailrom,pr.vioumr <br /> agmed to conditions desisted intO Ciy,contract documents require <br /> naticvion to meet Me new concerns of local rated management rel. <br /> Negotiating the newesmatent conditions will require...go work hy ourdesign <br /> consultant and result in changes to the contract Staff recommends Mat Me <br /> pmvious hids rdected and tharthe engineer be allowed to modify Lhe tonlact <br /> dec....mum reflect the revised easement congas of the MST railroad. <br />• <br /> 344 <br />