Laserfiche WebLink
tbat Me lermularity of TEN's!More to Include ell qualifying Mforrnallon in <br /> the hid ferm be noised and Met the comm.for Me Effluent Improvements <br /> Pipe Itegis.ment Project be...ad to the low.ladder.TEN <br /> extended tor the estimeted tool St09.1111.42 remit.at the hid opening <br /> had at MO p.m...1.'124.1.Es <br /> m gme <br /> pott,t is to go a turmel under I.5 sexer effluent lagoon and Ste <br /> contentions,boring failed previously.Two different tunneling medudst pi, <br /> ramming of mitso tunnelMg 'mut.to he used.A 60 inch ming have <br /> to heaven 220 fen.firsoilications were*veto*xith Mingent <br /> in mind.Thor woe onit too Four projeas of at len.100 fem in length <br /> end 36 inches in diemeter int°King me of the two specified method were <br /> TTN.the low bidder.neglected to litt ro.peoje.Mot nut.Teetfie.4. <br /> anached ed4ilional ofixen,.Mt*.tseminolts A.stng <br /> Isd...B.C..Cane.is de..ling suluentomor that will he used by Tfil4 for <br /> this toot.toms Ste pi,num..meMod.Mr.MilM stated an investigation <br /> xat condoned to see if they met minimum qualifications aul We,did find <br /> that Met did meet the qualifications. <br /> if the pro..mune in MM.bid ot <br /> utlee Ms Miller replied that it came in wub the.package. <br /> Councilman.Noine go...what the...method is and if a Canadim <br /> employ woohl oleo the necessary requirements,Atoms,V.ght Impended <br /> that so long asthey have prom and bonding and•spokesmm Me <br /> United States NT could mmming is.preferred method acconling to <br /> Boltes.momey.Fn.foluctio Construction stamd that Me moust is <br /> based on*.fuo that the City entered into the proemmtm knowit.Mat L.< <br /> Tema problem en the prior emu..IMCO wss not a tunneit.conoloor.City <br /> 490 <br />• <br />