Laserfiche WebLink
• <br /> October,ICOS <br /> 511.FT 11,11RIS.PATH SM. <br /> October 1St I.Sh MO pat-9:30 p.m,.as requested br the Rosy.1.Car <br /> Ct. • <br /> canied. <br /> • <br /> CAII I FOR I STITROOSITITSR.T.taf.27 lartaDWAV WPM.° <br /> Alove”s Counclimentber Pope,seconded by founcilmember ilanum to <br /> • m.o.• sLettera of Interest.for dui.and constant. I <br /> contract with Enhanco Eng..However.that con...cs not include <br /> ProviSions to provide engineering smices tor.nest phuu of this project Sttio •• <br /> design phue and.construction Inter to proceed v.these next <br /> phases of work,according to sane law we m.advedise . <br /> raw contracts.a consulting enginaring firm <br /> The primary elements of design phase include the design of the five lane <br /> roach.including associated storm dninage,traffic Mgrs.1_access <br /> improve...acquisition of required additi.d tigh.f.way,completion of • a <br /> Corps or Engineers permit PraPorotion cona.camt <br /> .11 was called with all council...a voting yes except Couremembers <br /> Anderson and Overstroots.were excus. <br /> Mellon earrieth • <br /> • <br /> Sat <br />