Laserfiche WebLink
Mmth <br /> Bids for the Upgrade of LIR Stations ,b8 project were opened an March Id. <br /> 1998 with the followi.resales: <br /> C.A.Goodman Construnion S1,169.783.40 <br /> R.L.Alia Construction <br /> Shelf.,Construction 1.,310.00 <br /> Construction Co. <br /> MK Comm-nation 1,13,441.10 <br /> ,M.IId.Ib <br /> Nonlin Construction 1..1.103.00 <br /> 1Villiam P.Carroll Const.tion 1.3..00 <br /> • <br /> •C.A.GOMA WU the apparent low bidder with a hid of 81,160.9. <br /> .wever. at Of was made in their bid and they have invested to.released <br /> from their <br /> RID AWARD-LIFT STATIONS"/&8 UPGRADE <br /> Mo.by C <br /> Orentree <br /> C. <br /> be relea. <br /> of <br /> f1.16,1AtI.ao that <br /> mW tont Nie contract Constructionoodman diiLIR.tlantrom nBupgrade <br /> projbe award.to L.AU.CORSirtadialL,Seg..WA,based upon <br /> Imleonproposal and unit bidet unit prices Mended for We estimated t.of <br /> $1.168,93.00 r reMM..OM opening held at 3.00 p.m..March 10, <br /> rs voting yes <br /> Gipson and Pepe who were came. exceptwrcduembers <br />