Laserfiche WebLink
• <br />• <br /> July 15.1998 <br /> y .1938Nep n FW arch Wildlife W tion deadline for de funds is <br /> forward.both <br /> entity be designated:. <br /> & <br /> FS.2496 and the Wi application <br /> guMeltrrs m'pInset444ead <br /> WHEREAS.it is also necessary undet MEM 2A96 to designate a boundary <br /> hohMtlnWeet selection wig take place:. <br /> WHEREAS.there <br /> general consensus Mat for Emelt.Snohomish <br /> Casty.am eine withinnSnohomish Co.,Watershed <br /> Area(WNA,No.) I area within <br /> which to conduct the atorementiOned habitat-project selection. <br /> NOW THEREFORE.THE EMELT CRY COUNCIL DOES HEREBY <br /> RESOLVE <br /> Snobmdeb CsmtY it rte appropriate en.to he adminlswive lead <br /> for mmd <br /> 2.That-the Snohomish Con.&mud.be authorlaed to sub.the <br /> application for Nods on behalf of Everett nd other jusis.mions in the <br /> Snohomish River Basin. <br /> J.That Water Resource Inventory Area(W ]-the Snohomish River sin <br /> reasonable geographic w in which <br /> 2 m Basin develop bah.projects under <br />