Laserfiche WebLink
April 14.1999 <br /> WHEREAS.SEPA Addenda Numbers 1 and 2.evaluating the environmental <br /> impacts or Everen Station project changes.were published in July,1950,and <br /> lanuary. <br /> /HERE .M Everett Station bm completed the schematic design <br /> pluse:and <br /> WHEREAS,the schematic design results have incorporated Ole project cbma, <br /> identified SEPA Addenda Numbers I and 2 and ITC set fordt in v report <br /> prepared <br /> EREAS,the hemeae design msultsTuve been reviewed by City SAL and <br /> the gene.Pubic <br /> Man open House held schematic MaRnII.9PP.at Me presented <br /> Senior Com.and <br /> WHEREAS.a City uail nrolk[M1SE was held an the Everzn salon Project <br /> on April 14,1999: <br /> NOW.111EREFORE.BE IT RESOLVED DT THE CITY COUNCIL OF THE <br /> CITY OP EVERETT duo <br /> I.The schema.design report dated Ala..1 II.19%.is accepted and surf <br /> as pu bob IRE w.UCIRS <br /> developmem phase or[verznsmion. <br /> 2.Staff Is angina 4o proceed into Me design doolopmem Phase of the <br /> atItil Station Projen generally based upon t.site configumnon,station <br /> buikling sire aral estimated developmem cost m identified in sold schematic <br /> design mon. <br /> Roll <br /> m wasith all nn membevoting Y except Cwmm <br /> tenser <br />