Laserfiche WebLink
January 19,2000 <br /> Millar Elevator §378,000.00 <br /> Cascade Elevator 8459,770.00 <br /> Both of the bids exceeded the origiml budget allotment.Facilities hes acquired <br /> the servkes of an elevator consultant,Lerch,Bates&Associates,Inc.,to <br /> review the current construction specifications for the purpose of qualifying each <br /> proposed elevator upgrade and to prepare a new cons.etioa specification. <br /> REED-WALL STREET BUILDING ELEVATOR MODERNIZATION <br /> PROTECT <br /> Mored by Cauxllmembv Simpson,secaded by Cauncllmember Warnock <br /> to reject all bide for the Wall Stn.Building Elevator Mode...Ion <br /> WM.and authorize a rnbld of the project in March,2000. <br /> Roll was culled with all counciimembers voting yes except Cwmcilmembers <br /> Adersoe,Gipson and Pope who were messed. <br /> Motion carded. <br /> BID REPORT-CEDAR STREET IMPROVEMENTS/PACIFIC TO <br /> EVERETT AVENUE <br /> Bide for the Cedar Street Improvements project,Pacific Aver=to Everett <br /> Avenue,were opened and publicly read aloud on January 11,2000 at 2:00 p.m <br /> with the following results: <br /> Marchbank Construction $955.828.00 <br /> Production ExravaMg $967,881.25 <br /> Scoccolo Construction 6 970,128.00 <br /> Katspan,Inc. S 982,121.00 <br /> KLB Construction S 994,908.25 <br /> Thoraco Construction $997,765.35 <br /> 1.E.Work,Inc. $1,015,737.75 <br />