My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000/05/31 Council Minutes
>
Council Minutes
>
2000/05/31 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:10:00 PM
Creation date
9/29/2020 2:26:48 PM
Metadata
Fields
Template:
Council Minutes
Date
5/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> May 31,2000 <br /> Otto apparent low bidder,Precision Earthworks,did not meet the qualifications <br /> required by the specifications. <br /> BID AWARD-SOUTHWEST EVERETT ATHLETIC FIELDS <br /> CONSTRUCTION PROJECT <br /> Mored by CanncWoember Warnock,seconded by Couocilmember Pope <br /> that the contract for the Southwest Everett Athletic Fields Construction <br /> project be awarded to the lowest and most responsive bidder,Fuji <br /> Industries,Millon,WA,used upon their proposal and unit bid of unit <br /> prices extended for the estimated total of 51,996,500.00 as received at the <br /> bid opening held alt p.m.,May 16,2000. <br /> Roll was called with all cuuncilmembers voting yes except Courctlmembers <br /> Anderson,Campbell and Overstreet who were excused. <br /> Motion carried. <br /> BID REPORT-WATER TANKS PAINTING AND MAINTENANCE <br /> PROJECT/RESERVOIR I <br /> Bids for the Water Tanks Paimtng and Maintenance project,Reservoir 1,were <br /> opened and publicly read aloud on May 16,211C0 with the following results: <br /> T.Bailey,Inc. 5/03,822.21e <br /> Lang Painting Co. 5160,749.96 <br /> Foss Environmental 1773,967.25 <br /> "The apparent low bidder,T.Bailey.Inc.was not in full compliance with the <br /> bidding documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.