My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000/06/19 Council Minutes
>
Council Minutes
>
2000/06/19 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:11:08 PM
Creation date
9/29/2020 2:27:50 PM
Metadata
Fields
Template:
Council Minutes
Date
6/19/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lune 19,2000 <br /> AGREEMENT-SEWER MADI REPLACEMENT"A"/PULTON STREET <br /> WATER MAW REPLACEMENT PROJECT <br /> Moved by Councilmembee Anderson, seconded by Councilmember <br /> Overstreet to audioriae the Mayort sign a profess Dont servicesagreement <br /> with PertEngineering,Inc.Cue <br /> cooRon iaapeclion services <br /> eetn the <br /> Sewer Main Replacement"A"and Fulton Street Water Main Replacement <br /> project in the amount of 865,000.00. <br /> Roll was called with all councilmembere voting yes except Councilmembess <br /> Campbell and Pope who were exasal. <br /> Motion carried. <br /> BID REPORT-DUCTILE IRON PIPE <br /> Bids for Ducdle Iron Pipe were opened and publicly mad aloud on lure 6.2000 <br /> with the following results; <br /> U.S.Pipe&Foundry $78,213.72 <br /> Pacific States Cast Iron Pipe $85,685.40 <br /> Familiar NW $92,907.30 <br /> RID AWARD-DUCTILE IRON PIPE <br /> Moved by Councilmember Warnock, seconded by Councilmember <br /> Andereun that the contract for Ductile Iron Pipe he awarded to U.S.Pipe <br /> and Foundry,Kent,WA,based upon their proposal and wit bid of unit <br /> prices extended for the estimated total of 978,213.72 including Wa.Mngtan <br /> State sales lax. <br /> 260 <br />
The URL can be used to link to this page
Your browser does not support the video tag.