Laserfiche WebLink
July 5,200 <br /> BID AWARD-2000 PAVEMENT MARKING <br /> Moved by Couneilmember Simpson,seconded by Couneilmember Anderson <br /> that the eunincl for the 2000 Pavement Marking Project be awarded to <br /> Stripe Rite,hie,Auburn,WA,bared upon their proposal and unit bid of unit <br /> prices extended for the estimated total of 522,938.00 as received at the bid <br /> opening held at 2:00 p.m.,June 20,2000. <br /> Roll was robed with all councihnembers voting yes. <br /> Motion carried. <br /> CHANGE ORDER—PEDESTRIAN PATHWAYS&CURB RAMPS <br /> Moved by Couneilmember Anderson,seconded by Conneilmember Warnock <br /> to authorize the Mayor to lip Change Order No.2 to the Pedestrian <br /> Pathways and Curb Ramps Improvements contract with Pcodnctioe <br /> Excavating and Trueldng in the amount 0004,030.00.M } <br /> Roll was called with all cauncilmembees voting yes. <br /> Motion carried. <br /> JOB COMPLETE—PEDESTRIAN PATHWAYS&CURB RAMPS <br /> • <br /> Moved by Couneilmemher Pop,seconded by Couneilmember Simpson to <br /> accept the Pedestrian Pathways and Curb Ramps Improvements Project es <br /> complete allowing the Mayor to sign the Certificate of Completion,which <br /> wiu begin the retention period prior to the release of retainage in the amount <br /> of 517,203.00 to the general contractor,Production Excavating&Trucking, <br /> Inc. <br /> Roll was called with all councilmembem voting yes. <br /> Motion carried. <br /> 290 <br />