Laserfiche WebLink
September 27,200 <br /> STATEMENT OP QUALIFICATIONS-PUMPED EFFLUENT TO <br /> DEEPWATER OUTFALL PROJECT <br /> To authorize a call for Statements of Qualifications from qualified <br /> consultants for the design of the Pumped Emuevt to Deepwater Ou15.11 <br /> Project. <br /> STATEMENT OF QUALIFICATIONS-VALVE HOUSE NO.1 <br /> REPLACEMENT PROJECT <br /> To authorise a call for Statements of Qualifications for the design of the <br /> Valve Home No.I Replacement project. <br /> JOB COMPLETE-SEISMIC UPGRADES TO WATER AND <br /> WASTEWATER FACILITIES PROJECT <br /> To accept the Seismic Upgrades to Water and Wastewater Farllles project <br /> as complete allowing the Mayor to sign the certlllca10 of completion which <br /> Mil begin the 60 day retention period prior to the release of retainage In the <br /> amount of$3,221.52 to the general contractor,Illsey Corporation,Inc. <br /> Roll was called on to convent agenda items with W councihnembrrs voting yes <br /> except Couocilmmnber Anderson who was excused. <br /> Moho.carried. <br /> CHANGE ORDER-ASPHALT CONCRETE OVERLAY-2000 <br /> Moved by Couvdlmember Warnock,seconded by Cow0Dmember Gipson <br /> to authorlee to Mayor to elgalga Change Order No.Ito the Asphalt Concrete <br /> Overlay-2000 contract with CRR Aasoeleled Sand and Gravel in the <br /> amount of 156,013,70. <br /> 418 <br /> Lw_ vt.s.wm <br />