Laserfiche WebLink
{k1 <br /> October 11,2000 <br /> WORKSHOP-1-5INTERCHANGE <br /> Dave Daws,Engineering,remarked that the I-S Interchanges constructed is the <br /> 1960s no longer serve the purposes of the City of Everett.He sated that the <br /> City was fortunate to receive funding from the Federal government to study the <br /> interchanges on I-5 through Everett and the improvements needed to <br /> accommodate the growth of traffic in the area. He introduced Michael <br /> Stringham,Pecten Engineering,Inc.,and Klara Fabry,Department of <br /> Transporatwn. <br /> Michael 5triagham presented an overview of the fmdags in three para;regional <br /> level issues,local improvements to existing interchanges,and concepts for <br /> possible new interchange locations. <br /> The City Council meeting reconvened and adjourned at I1;15 a.m. <br /> City Clerk_77.vt/y n <br /> Read and approved az Prated. lI.11)�/�(/ /�// <br /> i <br />