Laserfiche WebLink
November 1,2000 • <br /> CHANGE ORDER-TECHNICAL ASSISTANCE/LANDFILL SITE <br /> Moved by Coeocllmember Warnock,seconded by Counciimember Gipson to <br /> authorize the Mayor to sign Change Order No.S with Floyd&Snyder Inc.In <br /> the amount of 3149,130.00 to provide technical malatanee to complete the <br /> actions Identified in the elope of work required by the Department of <br /> Ecology for the landfill site. <br /> Councilmember Pope stated that this item came before the Budget Committee and <br /> was recommended for approval. <br /> Roll was called with all eoumeilmembers voting yes except Counuilmmther <br /> Anderson who was excused. <br /> Mode,carried. <br /> AGREEMENT-WATER MAN REPLACEMENT 11C. <br /> Moved by Councllmember Simpson,seconded by Councllmember Pope to <br /> authorize the Mayor to sign an agreement with Peebellegon Associatm <br /> Consulting Engineers,Inc.to the amount of 399,940.00 to design Water Male <br /> Replaeemenl"C^. <br /> Roll was called with all c0uncilmembers voting yes except Couecilmember <br /> Anderson who was excused. <br /> Motion carried. <br /> CHANGE ORDER-FILTRATION PLANT <br /> Moved by Couotllmember Warnock,seconded by Condlmember Simpson <br /> to authorize the Mayor to sign a change abler with Trimav Residuals <br /> 488 <br />