My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001/05/16 Council Minutes
>
Council Minutes
>
2001/05/16 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:22:55 PM
Creation date
9/29/2020 3:14:55 PM
Metadata
Fields
Template:
Council Minutes
Date
5/16/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 16,2001 <br /> BID CALL—COLBY AVENGE OMPROVEMENT$ <br /> To authorize a call for bids for the Colby Avenue Improvement project from <br /> Everett Avenue to 2S°Street. <br /> BID CALL-2001 ASPHALT CONCRETE OVERLAY <br /> To authorize a call for bids for the 2001 Asphalt Concrete Overlay project <br /> BID CALL—617r STREET OVERCROSSEJG—EMBANKMENT <br /> To authorize a call for bids for the 61°Street Overcrossing—Embankment <br /> project <br /> JOB COMPLETE—CEDAR STREET IMPROVEMENTS <br /> To accept the Cedar Street Improvements project as complete allowing the <br /> Mayor to sign the mrti0eale of completion which will begin Yue 60 day <br /> retention period prior to the release of retainage M the amount of$51,295.03 <br /> toMegeneral contractor,Marshbaok Construction. <br /> JOB COMPLETE—GRAND AVENUE SIDEWALK/16'n STREET <br /> CURB RAMPS <br /> To accept the Grand Avenue Sidewa0J16n Street Curb Ramps project as <br /> complete allowing the Mayor to sign the certificate of completion which will <br /> begin the 60 day retention period prior to release of retainage Ic the amount <br /> of 510,5136.20 to the general contractor,Marshbaok Construction. <br /> 175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.