My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001/06/27 Council Minutes
>
Council Minutes
>
2001/06/27 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:26:14 PM
Creation date
9/29/2020 3:16:25 PM
Metadata
Fields
Template:
Council Minutes
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 27,2001 <br /> BID REPORT-KASCH PARK SOCCER FIELD SURFACE REPLACEMENT <br /> Bids for the Basch Perk Soccer Field Surface Replacement project were opened <br /> end publicly read aloud at 2:00 p.m.,June 19,2001,with the following results: <br /> Base Alternates <br /> Ohno Conawction 5489,364.00 AI-S 171,763.00 <br /> A2-$997,540.00 <br /> • A3-$1,097,263.00 <br /> A4-$816,971.00 <br /> $914,386.00 <br /> Tydie ht. $498,716.00 Al-$147,000.00 <br /> A2-$996,993.80 <br /> A3-$1,055,640.60 <br /> A4-$880,259.04 <br /> Precision Earthworks $524,500.00 Al-S 148200.00 <br /> AZ-S 998,800.00 <br /> A3-$1,135,000.00 <br /> 04-S 908.000.00 <br /> BID AWARD-KASCH PARK SOCCER FIELD SURFACE REPLACEMENT <br /> Moved by Couneilmember Warnock, seconded by Councilmember <br /> Overstreet that the contract for the Basch Park Soccer Field Surface <br /> Replacement project be awarded to the lowest responsive bidder,Ohne <br /> Construction,Seattle,WA,based upon their uole bid of unit prices plus the <br /> additive alternate A2(AstroPlay)for ee estimated total of$1,486,904.00 as <br /> received at the bid opening held at 2:00 p.m.,dune 19,2001. <br /> Sheilagh Conklin,13315 NE 66.Street,Kirkland,Pacific SporlSurfaces, <br /> stated that they participated in the hid from OFmo ConatmOion as a subcontractor <br /> foe alternate A4(Poligm5). She questioned why the City of Everen chose <br /> ahtemere A2(AsteoPley)which was priced 2180,569.00 higher than eltemate A4. <br /> She remarked that,after reviewing the bid documents and specifications,Pacific <br /> Sp0 Surfaces,Inc.feels that they have met or exceeded all of the requirements in <br /> 236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.