Laserfiche WebLink
June 27,2001 <br /> BID REPORT-KASCH PARK SOCCER FIELD SURFACE REPLACEMENT <br /> Bids for the Basch Perk Soccer Field Surface Replacement project were opened <br /> end publicly read aloud at 2:00 p.m.,June 19,2001,with the following results: <br /> Base Alternates <br /> Ohno Conawction 5489,364.00 AI-S 171,763.00 <br /> A2-$997,540.00 <br /> • A3-$1,097,263.00 <br /> A4-$816,971.00 <br /> $914,386.00 <br /> Tydie ht. $498,716.00 Al-$147,000.00 <br /> A2-$996,993.80 <br /> A3-$1,055,640.60 <br /> A4-$880,259.04 <br /> Precision Earthworks $524,500.00 Al-S 148200.00 <br /> AZ-S 998,800.00 <br /> A3-$1,135,000.00 <br /> 04-S 908.000.00 <br /> BID AWARD-KASCH PARK SOCCER FIELD SURFACE REPLACEMENT <br /> Moved by Couneilmember Warnock, seconded by Councilmember <br /> Overstreet that the contract for the Basch Park Soccer Field Surface <br /> Replacement project be awarded to the lowest responsive bidder,Ohne <br /> Construction,Seattle,WA,based upon their uole bid of unit prices plus the <br /> additive alternate A2(AstroPlay)for ee estimated total of$1,486,904.00 as <br /> received at the bid opening held at 2:00 p.m.,dune 19,2001. <br /> Sheilagh Conklin,13315 NE 66.Street,Kirkland,Pacific SporlSurfaces, <br /> stated that they participated in the hid from OFmo ConatmOion as a subcontractor <br /> foe alternate A4(Poligm5). She questioned why the City of Everen chose <br /> ahtemere A2(AsteoPley)which was priced 2180,569.00 higher than eltemate A4. <br /> She remarked that,after reviewing the bid documents and specifications,Pacific <br /> Sp0 Surfaces,Inc.feels that they have met or exceeded all of the requirements in <br /> 236 <br />