Laserfiche WebLink
September26,2001 <br /> Councilmember Gipson questioned if to the furore the term alibis contract could <br /> be longer.Murray.Gordon,Fire Department,answered that it has oaditionelly <br /> been a one year contract but there is no reason that it can't be longer. <br /> Rall was called with all coumilmembers voting yea. <br /> Motion carried. <br /> LIR REPORT—DUCTB,B IRON PIPE <br /> Bids for ductile von pipe were opened and read aloud September 11,2001 at 2:00 <br /> p.m.with the following results: <br /> Pacific States Cast tion Pipe Co. $82,144.00 <br /> Pamilian NW $95,472.00 <br /> Staff recommended awarding the contract for iron ductile pipe to the lowest <br /> responsive bidder,Pacific States Cut hon Pipe Company. <br /> BID AWARD—DUCTILE BION PIPE <br /> Moved by Counc0member Warnock,seconded by Councihnember Campbell <br /> that the contract for ductile iron pipe be awarded to Pacific States Cast Iron <br /> Pipe Co.,Renton,WA,based upon their proposal and unit bid of nail prices <br /> extended for the estimated annual total of$82,144.00 including Washingten <br /> State Sales Tax as received at the bid opening held at 2:00 p.m.,September <br /> 11,2001. <br /> Roll was called with all councilmembers voting yes. <br /> Motion carried. <br /> 4I5 <br />