Laserfiche WebLink
October 3,2001 <br /> AGREEMENT AMENDED—RESERVORI 42 LINER AND COVER <br /> REPLACEMENT <br /> Moved by Councilmember PopN seconded by Couucilmember Warooek to <br /> authorize the Mayor to sign Amendment No.1 to the contract with NOR <br /> Engineering,dated February 22,2001,for the Reservoir No.2 Liner and <br /> Cover Replacement project to Increase the maximum value of the contract <br /> from the original amount of$31,822.0010$89,810.00 <br /> Counctmember Pope stated Wet this item came before the Budget and Finance <br /> Committee with a recommendation for approval. <br /> Roll was called with all counciloremhers voting yes. <br /> Motion carried. /� <br /> AGREEMENT AMENDED—WATER POLLUTION CONTROL FACILITY L7 <br /> CAPACITY EXPANSION/PHASE <br /> Moved by Coune0member Warnaek,seconded by Couoeilmember Pope to <br /> authorize the Mayor to sign Amendment No.5 to We professional service <br /> agreement with Brown and Caldwell for the Water Pollution Control Facility <br /> Capacity Repanslan projec4 Phase BY,Maintenance Building Design,in the <br /> amount of 0339,5 90.00. <br /> Comwtilmember Pope stated Wet this item came before the Budget and Finance <br /> Committee with a recommendation for approval. <br /> Roll was called with all couocibnembers voting yes. <br /> Malian ear-led. <br /> 430 <br />