My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002/09/04 Council Minutes
>
Council Minutes
>
2002/09/04 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:34:21 PM
Creation date
9/29/2020 3:33:40 PM
Metadata
Fields
Template:
Council Minutes
Date
9/4/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 4,2002 <br /> BID AWARD-DUCTILE IRON PIPE <br /> Moved by Council Member Campbell,seconded by Council Member <br /> Overstreet that the contract for Ductile Iron Pipe be awarded to the <br /> lowest responsive bidder,Hughes Supply Co.,Inc.,Marysville,WA, <br /> based upon their unit prices bid extended for an estimated annual <br /> total of$59,295.25 including Washington State sales tax as received <br /> at the bid opening held at 2 p.m.,August 13,2002. <br /> Roll was u <br /> called with all council members voting yes except Council <br /> MemberPope who voted no. <br /> Motion canted. <br /> PURCHASE-TRAILER MOUNTED VACUUM SYSTEM <br /> Moved by Council Member Campbell,seconded by Council Member <br /> Krell to approve the purchase of one trailer mounted vacuum system <br /> for the amount of$86,740.80 from Alderarood Water and Wastewater <br /> District Bid No.200231-01 awarded to Seattle Pump and Equipment. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> AGREEMENT AMENDED-PORTAL NO.4 MODIFICATIONS <br /> Moved by Council Member Pope,seconded by Council Member Krell <br /> to authorize the Mayor to sign Change Order No.4 to the Portal No.4 <br /> Modification contract with TEK Construction in the amount of <br /> $138,028.13 to upgrade pressure transmitter housings and level <br /> inductive probes to the 316 stainless steel materials;supply and <br /> install a Linksys Ethernet Hub;make modifications to the 52 inch <br /> pipeline;and to extend overhead. <br /> 300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.