My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002/11/06 Council Minutes
>
Council Minutes
>
2002/11/06 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:33:21 PM
Creation date
9/29/2020 3:35:28 PM
Metadata
Fields
Template:
Council Minutes
Date
11/6/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 6,2002 <br /> No.2,to the East Everett Pedestrian Walkway,Stage 1 contract with <br /> Schwa.Construction,Inc.in the amount of$21,936.27 for sidewalk <br /> and driveway repairs,adjustment of a manhole and valve box,and <br /> replacement of an irrigation system. <br /> Roll was called with all council members voting yes except Council <br /> Member Campbell who was excused. <br /> Motion carried. <br /> AGREEMENT AMENDED—EVERETT STATION <br /> Moved by Council Member Overstreet,seconded by Council Member <br /> Krell to authorize the Mayor to sign Addendum No.2 to the Everett <br /> Station and Everett Station Street Improvements Construction <br /> Testing and Special Inspection Services contract with Material <br /> Testing and Consulting,Inc.In thy amount of$16,824.75 for <br /> additional testing of the pavement and concrete,fire proofing and <br /> welding Inspections. <br /> Roll was called with all council members voting yes except Council <br /> Member Campbell who was excused. <br /> Motion carried. <br /> AGREEMENT AMENDED—EVERETT STATION <br /> Moved by Council Member Krell,seconded by Council Member Pope <br /> to authorise the Mayor to sign Change Order No.11 to the Everett <br /> Station Construction contract with Wilder Construction Company in <br /> the amount of$31,291.47 for the installation of a glass enclosure at <br /> the ticket counter,Installation of two additional windscreens at the <br /> passenger shelters;relocation of a standpipe;and installation of a <br /> workers'appreciation plaque. <br /> 371 <br />
The URL can be used to link to this page
Your browser does not support the video tag.