Laserfiche WebLink
• <br /> April 9,2003 <br /> AGREEMENT AMENDED—TRANSMISSION LINE NO.2 AND NO.3 <br /> REPLACEMENT <br /> Moved by Council Member Krell,seconded by Council Member <br /> Campbell to au itoriae the Mayor to sign Change Order No.1 to the <br /> Transmiselon No.2 and No.3 Replacement project,Phase 5,with Td <br /> State Constmction,Inc.In the amount of(6116,879.61(to cover <br /> overruns and&dentine. <br /> Roll was called with all council members voting yes except CaunEd <br /> Members Pope and Overstreet who were excused. <br /> Motion eardad. <br /> JOB COMPLETE—TRANSMISSION NO.2 AND NO.3 REPLACEMENT <br /> PHASE 5 <br /> Moved by Council Member Gipson,seconded by Council Member <br /> Krell to accept the contract for the Transmisslun Line No.2 and No.3 <br /> Replacement project,Phase 5,as complete and authorize the Mayor <br /> to sign a certificate of completion which will begin the 80day <br /> retention period prior to the release of retainege In the amount of <br /> 6172,000.27 to the general contractor,Tri Stale Construction. <br /> Roll was called OR.all council members voting yes except Council <br />• Members Pope end Overstreet who were excused. <br /> Motion carried. <br /> AGREEMENT—BOND STREET PEDESTRIAN IMPROVEMENTS <br /> Moved by Council Member Gipson,ea onded by Council Member <br /> Olson to authorize the Mayor to sign a construction and maintenance <br />