Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> April 30.2003 <br /> • <br /> AGREEMENT—CROSS-TOWN EFFLUENT PIPELINE <br /> Moved by Council Member Krell,seconded by Council Member Pope <br /> • <br /> • to authorize the Mayor to sign a 2003 Public Works Trust Fund <br /> • <br /> construction loan contract for the Cross-town Effluent Pipeline. <br /> • <br /> R011 was called with all council members voting yes. <br /> • <br /> • Motion carried. <br /> • <br /> AGREEMENTS AMENDED <br /> Moved by Council Member Campbell,seconded by Council Member <br /> Krell to authorize the Mayor to sign amendments to existing Public <br /> Works Trust Fund Loan Agreements PW.5-58-962-011,PW-01.T91- <br /> • 025,PW-09-691-026,PW589.962-020,PW5.91.280-023,PW-93-200- <br /> 020,PW-94-784-011,PW5.95-791-008,PW-02-91-PRE-106,PW-98- <br /> 791-PRE-l0a, and PW-5.96-791-016, removing the acceleration <br /> clause language. <br /> • <br /> Roll was called with all council members voting yes. <br /> Motion carried. • <br /> 1 AGREEMENT AMENDED <br /> Moved by Council Member Pope,seconded by Council Member <br /> Campbell to authorize the Mayor to sign Amendment No.6 to the <br /> agreement with Brown and Caldwell for Maintenance Building <br /> Design and Construction Management Services at the Everett Water <br /> • Pollution Control Facility in the amount of$60,330 for additional <br /> services and to extend the completion date to November 14,2004. <br /> 128 <br />