Laserfiche WebLink
September 10,2003 <br /> AGREEMENT AMENDED—2003 ASPHALT CONCRETE OVERLAY <br /> Moved by Council Member Olson,seconded by Council Member Krell <br /> to authorize the Mayor to sign Change Order No.1 to the contract <br /> with Rinker Materials for the 2003 Asphalt Concrete Overlay project <br /> in the amount of$36,966.36 for overruns and underruns. <br /> Roll was <br /> called with all council members voting yes except Council <br /> MemberPope who abstained <br /> Motion carded. <br /> AGREEMENT—WATER POLLUTION/WATER FILTRATION PLANTS <br /> Moved by Council Member Krell,s onded by Council Member <br /> Campbell to authorize the Mayor to sign a professional services <br /> agreement with CADD Consulting Services,Inc.for the production <br /> and conversion of drawings of the Water Pollution Control Facility <br /> and the Water Filtration Plant In the amount of$233,630.00. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> AGREEMENT—SR 527,132X°TO 112T"STREET WIDENING <br /> Moved by Council Member Pope,seconded by Council Member <br /> Olson to authorize the Mayor to sign a Utility Construction <br /> Agreement with the Washington State Department of Transportation <br /> for the SR 527,132n°to 112"Street SE Widening project fora new <br /> sewer main ata cost of$S75,n00.00 to the City of Everett and water <br /> main modifications ata coat of$295,000.00 to the State. <br />