Laserfiche WebLink
September 14,2005 <br /> JOB COMPLETE—2004 SIGNAL IMPROVEMENTS <br /> To accept the 2004 Signal Improvement project as complete and <br /> authorize the Mayor to sign a certificate of completion which will <br /> begin the 60-day retention period prior to the release of retainage in <br /> the amount of$18,822.00 to the general contractor,Translech <br /> Electric,Inc. <br /> JOB COMPLETE—BIOLSOLIDS AND BACKWASH SOLIDS <br /> REMOVAL.PHASE 2 <br /> To accept Phase 2 of the Blosolids and Backwash Solids Removal <br /> project as complete end authorize the Mayor to sign a certificate of <br /> completion which will begin the 60-day retention period prior to the <br /> release of retainage in the am,unt of$68,697.39 to the general <br /> contractor,Residuals ProcessingInc. <br /> Holl was called with all council members voting yes except Council <br /> Member Overstreet who wee excused. <br /> Motion carried. <br /> PUBLIC AUCTION <br /> Moved by Council Member Stonecipher,seconded by Council <br /> Member Hatloe to declare a Mudcat SP-810 Dredge as surplus and <br /> authorize sale at a public auction to be conducted by James G. <br /> Murphy,Auctioneer. <br /> Roll was celled with all council members voting yes except Council <br /> Member Overstreet who was excused. <br /> Motion carried. <br /> 301 <br />