Laserfiche WebLink
May 27,2009 <br /> RESOLUTION-ELECTRONIC TRANSFERS <br /> To adopt Resolution No.6148 acknowledging the payment of audited <br /> and approved electronic transfer claims against the city of Everett in <br /> the amount of$4,176,575.46 for the period of February 1,2009 <br /> through February 26,2009. <br /> RESOLUTION-ELECTRONIC TRANSFERS <br /> To adopt Resolution No.6149 acknowledging the payment of audited <br /> and approved electronic transfer claims against the city of Everett in <br /> the amount of$5,129,131.71 for the period of March 1,2009 through <br /> March 31,2009. <br /> JOB COMPLETE-SEWER SYSTEM REPLACEMENT"I° <br /> WATER REPLACEMENT"J" <br /> To accept the Sewer System Replacement "I" and Water <br /> Replacement"J"project as complete and authorize the Mayor to <br /> sign the certificate of completion which will begin the 60 day <br /> retention period prior to the release of the retainage bond to the <br /> general contractor,KLB Construction. <br /> STREET CLOSURE-4r"OF JULY PARADE <br /> To approve a rolling street closure beginning on 25.and Colby and <br /> ending on 25.and Wetmore and the closures of Rockefeller, <br /> Wetmore and Colby,23i°to 251h Street,for a 4.of July Parade on <br /> July 4,2009,July 4,2010,and July 4,2011,8 a.m.to 3 p.m., <br /> sponsored by the city of Everett with the condition that personnel be <br /> tn site and prepared to accommodate emergency vehicle access In <br /> he event of an emergency. <br /> 135 <br />