Laserfiche WebLink
July 29,2009 <br /> CHANGE ORDER—REPLACEMENT OF WATER TRANSMISSION <br /> LINES 2 AND 3.PHASE 6 <br /> Moved by Council Member Olson,seconded by Council Member <br /> Roberts to authorize the Mayor to sign Change Order No.2 with Tri- <br /> State Construction for the Replacement of Water Transmission Lines <br /> 2 and 3,Phase 8 project In the amount of$183,080.08. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> AGREEMENT AMENDED—SEWER SYSTEM REPLACEMENT W. <br /> SCHEDULE"B' <br /> Moved by Council Member Nielsen,seconded by Council Member <br /> ARholter to authorize the Mayor to sign Amendment No.5 to the <br /> professional services agreement with CNN Engineers,LLC for <br /> engineering services for the Sewer System Replacement"F" <br /> Schedule"B"project in the amount of$255,176.00 for a total <br /> contract amount of$1,382,603.00. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> COUNCIL BILL NO.0907-22 <br /> SECOND READING; <br /> AN ORDINANCE relating to State Highway Access Permitting and <br /> Classification adding a new chapter to the Everett Streets and <br /> Sidewalks Code,Title 13 of the Everett Municipal Code <br /> 218 <br />