Laserfiche WebLink
December 30,2009 <br /> the amount of$3,767,523.11 for the period of November 1,2009 <br /> through November 30,2009. <br /> JOB COMPLETE <br /> To authorize the Mayor to sign a certificate of completion for the <br /> Lions Park Renovation project which will begin the 60-day retention <br /> period prior to the release of retainage in the amount of$37,903.18 to <br /> the general contractor,Faber Brothers Construction. <br /> BID CALL <br /> To authorize Bid Call No.2009.092 for the purchase of thirteen new <br /> surface aerators at the Water Pollution Control Facility. <br /> Roll was called with all council members voting yes except Council <br /> Member Had.who was excused. <br /> Motion carried. <br /> BID AWARD—INTEGRATED TRANSIT TECHNOLOGY SYSTEM <br /> Moved by Connell Member Roberts,seconded by Council Member <br /> Nielsen to award the fixed route portion of RFP 09-034,Integrated <br /> Transit Technology System,to Strategic Mapping,Inc.and authorize <br /> the Mayor to sign a contract in the amount of$739,949.00 plus <br /> Washington State sales tax. <br /> Roll was called with all council members voting yes except Council <br /> Member Hat0a who was excused. <br /> Motion carried. <br /> 389 <br />