Laserfiche WebLink
October 27,2010 <br /> Reject Gary Harper Construction,Inc.bid as non-responsive and <br /> award the Water Pollution Control Facility Phase B-1A <br /> Improvements Project to the lowest responsive bidder,McClure <br /> and Sons,Inc.,in the amount of 5408,088.04 including Washington <br /> State sales tax and authorize the Mayor to sign the contract with <br /> McClure and Sons Inc. <br /> Presentation by Dave Davis,Public Works <br /> PROPOSED ACTION AGENDA ITEMS—FUTURE MEETING SII <br /> COUNCIL BILL NO.1010-27 <br /> SECOND READING: <br /> AN ORDINANCE levying the general taxes for the City of Everett <br /> for fiscal year commencing January 1,2011,on all taxable <br /> property,both real and personal,subject to taxation thereon,for the <br /> purpose of raising a potion of the revenue to carry on City <br /> operators for the ensuing year,as required by the Charter of the <br /> City of Everett and the laws of the State of Washington. <br /> Authorize the Mayor to sign Amendment No.1 to the professional <br /> services agreement with J.Bozeat&Associates,LLC for valve and <br /> valve actuator related services at the Water Filtration Plant at no <br /> additional cost <br /> Authorize the Mayor to sign a 2010 Memorandum of Understanding <br /> with the Washington Traffic Safety Commission regarding <br /> participation in high visibility enforcement traffic safety emphasis <br /> patrols <br /> CONSENT ITEMS: <br /> Moved by Connell Member Gipson,seconded by Council Member <br /> Aflholter to approve the following consent items: <br /> 301 <br />